Summary

20 Balderton Street went through a comprehensive redevelopment of the fourth to eighth floors with the objective of delivering 28,000 square feet of high-quality offices for letting at a prestigious Mayfair address. It includes the office suites together with the ground floor reception in Balderton Street, common parts, private terraces and green roofs on upper floors as well as a spectacular communal roof terrace. Project completed in September 2021.

The development sits above the new Adidas store (main entrance on Oxford Street) completed in June 2019 which involved the radical alteration and improvement of the lower 5 floors of the building to create a 42,169 sq ft flagship store subject to a pre-let to Adidas.

An exclusive access to bespoke fit-out solutions was also provided from TX Thirdway Architecture. By using cutting edge technology, prospective occupiers had an opportunity to create a virtual fit out bespoke to their requirements.

Find out more from TX.

Visit our 20 Balderton Street page.

Key points

  • Comprehensive refurbishment of the offices, common parts and reception to the highest contemporary standards
  • Office suites from 1,235 sq ft to 3,850 sq ft, North and South wings
  • A new Variable Refrigerant Floor (VRF) fan coil unit (FCU) system
  • Raised access floor system
  • Renewal of all mechanical and electrical services
  • Increased office floor to ceiling heights
  • Reconfiguration of the toilet blocks
  • Reconfiguration and enlargement of the reception
  • Reception with designated touch down, fully WiFi working zone and coffee-making facilities
  • Communal roof terrace on level 9
  • Private roof terraces on levels 7 and 8
  • Sedum green roofs on level 6, 7, 8 and 9
  • Improvements to the new basement cycle and shower facility

Availability

8th North – 1,486 sq ft – let
8th South – 1,235 sq ft – let
7th North – 2,441 sq ft – let
7th South – 1,918 sq ft – let
6th North – 3,820 sq ft – let
6th South – 2,855 sq ft – let
5th North – 3,845 sq ft – let
5th South – 3,027 sq ft – let
4th North – 3,850 sq ft – let
4th South – 3,030 sq ft – let

Contact

Julian Milne, Stow

jrm@stowplc.com

+44 (0)20 7409 7400

http://www.20baldertonstreet.com

Summary

33 Davies Street is a distinctive landmark building of 36,000 sq ft of highly specified Grade A offices with one of London’s most prestigious addresses, opposite Claridge’s Hotel. It has been acquired in 2003 and comprised 3 separate buildings, 29-35 Davies Street behind a unified neo-Georgian façade.

The development set a new standard in West End office design and service preparing for the dynamic change that Crossrail will bring to Mayfair in 2018.

The design by HOK architects combines distinctive contemporary architecture with traditional brick and Portland stone faade materials. The Grade-A air conditioned offices were built to the highest specification, spanning five floors, flexibly designed for multi-letting. An imposing entry space includes double height ceilings and three 3.6m bronze portcullis gates, designed by artist Wendy Ramshaw.

Key points

  • 28,856 sq ft of Grade A office space
  • 7,600 sq ft ground floor retail space
  • Strong environmental credentials achieving an 'Excellent' rating by BREEAM.
  • Portcullis gates designed by Wendy Ramshaw
  • Personalised and bespoke concierge service for tenants

Contact

Julian Milne, Stow Securities Plc

jrm@stowplc.com

+44 20 7409 7400

Summary

Originally constructed in the 18th century, but reconstructed behind its façade in the early 1980’s linking through to 27 Three Kings Yard to the rear at ground and lower ground floor levels. The property provides modern air-conditioned office accommodation.

Key points

  • Offices totaling 12,675 sq ft
  • Occupied by the Government of Argentina and used as Embassy and Consulate General
  • Prime location in the heart of London's Mayfair close to Claridge's Hotel

Contact

Julian Milne, Stow Securities Plc

jrm@stowplc.com

+44 20 7409 7400

Summary

Adidas global flagship store has opened its door in October 2019 following a reconfiguration and extension of the five floors (42,000 sq ft) to create a self-contained retail unit with a main entrance on Oxford Street.

The redevelopment work was undertaken in a series of phases over a circa two years period. The preliminary phase of activity started on site at the end of August 2016 and included the strip out of the floors and the removal of asbestos in the ground and basement floors. Handover of the bespoke scheme to adidas, to include stairwells and lift cores, took place in June 2019.